Timbangan Truk Thunder Besi
TIMBANGAN TRUK THUNDER BESI ADALAH TIMBANGAN TRUK PORTABLE PLATFORM BESI BAJA YANG MEMILIKI PILIHAN KAPASITAS BERAT 10/15/20 TON DENGAN HARGA YANG JAUH LEBIH MURAH, DIMULAI DARI RP. 80 JUTA, NAMUN TETAP MEMILIKI AKURASI TINGGI DAN DAYA TAHAN YANG KUAT. TIMBANGAN TRUK THUNDER BESI INI COCOK DIGUNAKAN PADA INDUSTRI KELAPA SAWIT, KIMIA, KONSTRUKSI, DAN BERBAGAI SEKTOR INDUSTRI LAINNYA.
Timbangan Truk Thunder Besi Cocok Digunakan Pada Bisnis Usaha Apa Saja?
Spesifikasi Timbangan Truk Thunder Platform Besi
NO. | SPESIFIKASI | KETERANGAN | KET. TAMBAHAN |
01 | Merk / Tipe | GEWINN / GPT-0402-T020A / GPT-0602-T020A | |
02 | PIlihan Dimensi | Dimensi Luar: | |
03 | Plat | Plat Kapal – Ship Plate t.8 mmx 3000 mm x 4 Sisi | 4 Modul Plat |
04 | Tipe | Atas Tanah | |
05 | Batang Utama | WF 150 x (2400 atau 3000) x 2 x 4 Modul w/ Stiffenner | 4 Unit / Sisi 8 Bar |
06 | Batang Pendukung | WF 150 x100x5,5x8 (Cross Beam) | 1 Lot |
07 | Sistem | Portable Truck - Moveable - Double Frame | 1 Lot |
08 | Kapasitas | 20 Ton | |
09 | Resolusi | 10 Kg (OIML R60C3) | |
10 | Pengecatan | Double coated ( 2x Proses Pengecatan) | 2x |
11 | Penyambungan | Permanen – Las CO | |
12 | Load Cell | Loadcell ShearbeamType LC-TOR-10Ton | 8 Unit LC (Set w/ Mounting) |
13 | Kabel Load Cell | Ada | 10 M |
14 | Overload Rating (Save) | Ada | 120% |
15 | Overload Rating (Ultimate) | Ada | 300% |
16 | Indikator | XK3118-T1 : LED Display, Backup Battery, Insufficient Voltage Protection, Linear Point Calibration, Manual Setting on Board or Auto Setting by Programme in CPU | 1 Unit |
17 | Interface | RS-232C for Interface Communication Programme | |
18 | Lightning Protection | Termasuk (Built In) | |
19 | Junction Box | Termasuk (Cover Stainless with Internal Sealed) | 2 Unit |
20 | Software | TS-Gewinn (Standard), Life Time Warranty | 1 Unit |
21 | Tera | Termasuk, Sertifikasi Metrologi | 1 Unit |
22 | PC / Komputer / Laptop | Dual Core (Asus/Acer dll) w/ Kabel Aten | Optional |
23 | Printer | Epson Dot Matrix LX-310 | Optional |
24 | Tanjakan | Tanjakan Besi 1 Sisi | Optional |
Harga Timbangan Truk Thunder Platform Besi
Panjang 4,8 Meter - Kapasitas 20 Ton
KETERANGAN | JUMLAH (Rp) | |
1 | UNIT PLATFORM SCALE (PORTABLE SCALE) Tipe: GPT-0402-T020A (Portable System) | 45.000.000 |
2 | ELECTRONIC WEIGHING DEVICE (DISPLAY DIGITAL) | 30.000.000 |
3 | Supervisi & Pengarahan Via TELPON/VIDEO CALL Cara TURUNIN | TERMASUK |
4 | Surat Sertifikasi Tera Metrologi @PT.GEWINN (Bekasi/CIkarang) | 3.500.000 |
5 | Program Timbangan (Install via Supervisi Online) | 1.500.000 |
HARGA FRANCO JAKARTA – On Site/Loco PABRIK GEWINN | 80.000.000 | |
OPTIONAL (TAMBAHAN BILA DIPERLUKAN): | ||
Transport-Akomodasi TEKNISI ke Lokasi (Setting-Testing-Trainning) | FREE | |
ONGKIR (Pengiriman Platform ke JABODETABEK/PULAU JAWA) | FREE | |
ONGKIR (Pengiriman Platform ke KOTA PROVINSI SUMATRA) | 3.500.000 | |
ONGKIR (Pengiriman Platform ke KOTA PROVINSI SULAWESI/KALIMANTAN) | 5.000.000 | |
ONGKIR (PengirimanPlatform ke KOTA PROVINSI NTT/NTB/PAPUA) | 8.500.000 | |
Tanjakan Besi 1 (satu) Sisi Arah Masuk | 15.000.000 | |
Tanjakan Beton 1 (satu) Sisi Arah Masuk | 7.500.000 |
Panjang 6 Meter - Kapasitas 20 Ton
KETERANGAN | JUMLAH (Rp) | |
1 | UNIT PLATFORM SCALE (PORTABLE SCALE) Tipe: GPT-0602-T020A (Portable System) | 53.000.000 |
2 | ELECTRONIC WEIGHING DEVICE (DISPLAY DIGITAL) | 32.000.000 |
3 | Supervisi & Pengarahan Via TELPON/VIDEO CALL Cara TURUNIN | TERMASUK |
4 | Surat Sertifikasi Tera Metrologi @PT.GEWINN (Bekasi/CIkarang) | 3.500.000 |
5 | Program Timbangan (Install via Supervisi Online) | 1.500.000 |
HARGA FRANCO JAKARTA – On Site/Loco PABRIK GEWINN | 90.000.000 | |
OPTIONAL (TAMBAHAN BILA DIPERLUKAN): | ||
Transport-Akomodasi TEKNISI ke Lokasi (Setting-Testing-Trainning) | FREE | |
ONGKIR (Pengiriman Platform ke JABODETABEK/PULAU JAWA) | FREE | |
ONGKIR (Pengiriman Platform ke KOTA PROVINSI SUMATRA) | 3.500.000 | |
ONGKIR (Pengiriman Platform ke KOTA PROVINSI SULAWESI/KALIMANTAN) | 5.000.000 | |
ONGKIR (PengirimanPlatform ke KOTA PROVINSI NTT/NTB/PAPUA) | 8.500.000 | |
Tanjakan Besi 1 (satu) Sisi Arah Masuk | 15.000.000 | |
Tanjakan Beton 1 (satu) Sisi Arah Masuk | 7.500.000 |
Syarat Pembelian & Garansi
A. Harga
- Validasi sampai dengan 15 hari dari tanggal penawaran
- Termasuk : Unit Platfom Jadi/Siap Timbang (Rangka Platform baja+ Electronic+Display Timbangan Terpasang), Instalasi (via online/video), Kalibrasi-Tera, Gambar Lantai Kerja, FOB Workshop / Pengiriman Jabodetabek
- Belum termasuk : PPN 11%, Ongkir/Pengiriman Luar Kota, Transport Tehnisi ke Lokasi (buat Setting-Testing-Trainning), Pembuatan Pondasi Sipil, Rumah Pos Timbang (Pos Kontrol)
- Berlaku harga FRANCO/LOCOWORKSHOP/JAKARTA
B. Pembayaran
- 50% DP (saat sudah PO/Order)
- 45% saat barang barang siap kirim (sebelum kirim), unit timbangan sudah selesai di rakit,
bisa inspeksi ke Workshop. - 5% saat barang tiba di lokasi
C. Pengiriman barang:
- Barang dikirim dalam waktu 15-20 hari kerja terhitung sejak PO/Order dan pembayaran DP diterima.
D. Garansi:
- Garansi Platform selama 1 (satu) tahun.
- Garansi Service dan Sparepart selama 1 (satu) tahun
- Garansi Software/ Programme selama 1 (satu) tahun
- Garansi tidak berlaku untuk kondisi force majeur.
- Garansi belum termasuk biaya transportasi diluar kota besar dan luar pulau.
E. Gambar Pondasi
- Diberikan dan disupervisi pada saat DP/PO Order diterima.
F. Instalasi Training
- Pihak pembeli menyediakan alat-alat pendukung untuk penurunan platform dan instalasi di lokasi seperti bisa Takel Rantai Crane atau Forklift 1-2 Ton atau hoist crane(hanya bongkar-tata saat di Lokasi saja), Listrik (buat operasional timbangan), Truck Balast(untuk testing awal timbang) dan lain-lain.
- Penurunan Platform sesuai supervisi dan mengikuti video manual penurunan platform
- Trainning dilakukan secara Online (Video WA Call atau Zoom/Skype Meeting), Install Program via Online/Team Viewer dan Manual Book Cara Pakai Program.
G. Pembatalan Kontrak
- Bila terjadi pembatalan kontrak,Penjual berhak atas uang muka yang telah dibayar Pembeli.
- Penjual berkewajiban mengembalikan uang muka yang telah dibayar Pembeli apabila Penjual tidak melaksanakan kewajiban sebagaimana yang tercantum diatas.